Infrabel

Barco helps Infrabel live up to its motto of 'When rail means service'

It was a step-change difference for operators of the signal box in Bruges, Belgium, when they moved to their new control center in 2005. They swapped their trusted room with relay-based signaling systems for an ergonomically designed control room, equipped with a computerized Siemens system to support them in directing rail traffic. In February 2008, their comfort levels were raised further, when a large-size Barco video wall was installed to provide a 'live' overview of their region's rail traffic situation.

The Bruges control center is just the beginning of an ambitious signal box concentration program set up by Infrabel, the manager of the Belgian rail infrastructure. By the end of 2012, Barco video walls will support operators in many more signal boxes to further enhance the efficiency and safety of Belgium's rail network.

About this project

Application
Date 09 September 2009
Location Bruges, Belgium
Press release

28 November 2008

Infrabel inaugurates second Barco-Siemens equipped rail traffic signaling center

Downloads
|

Related References

ASFINAG

16 December 2014 - Austria

Related References

King Fahad Medical City (KFMC)

04 December 2014 - Saudi Arabia

Related References

PPL Electric Utilities

21 October 2014 - United States

Related References

Qatar broadcast companies

14 October 2014 - Qatar

Related References

Televisión de Galicia

29 September 2014 - Spain

Related References

MBC

02 September 2014 - Korea Republic of