Neckarwerke Stuttgart AG
Case study
The load dispatch center of Neckarwerke Stuttgart AG was designed to control the 380 KV, 220 KV and 110 KV networks and the energy generation system after the merger between Neckarwerke AG Esslingen and Technische Werke Stuttgart AG. Barco's large screen display wall, comprising 8 x 4 50" projection modules was integrated into the existing PSIControl system, and displays the entire high voltage network at a glance.
About this project
| Market(s) |
|
| Date | June, 2003 |
| Location | Stuttgart, GERMANY |
| Downloads |