Barco 검색

myBarco 알림

읽지 않음

읽기

알림이 전혀 없습니다.

연중무휴 에너지 분배 모니터링을 위해 설계됨

공공시설 제공업체들은 전기, 석유, 가스 및 상수도 등의 필수 서비스를 가정 및 산업에 공급해야 하는 막중한 책임을 지고 있습니다. 에너지 및 공공시설 부문에서는 고객과의 향상된 상호작용, 간소화된 운영, 자동화된 프로세스 및 더 큰 효율성 측면에서 큰 승리를 약속하는 변화인 디지털 혁신에 점점 더 집중하고 있습니다. 그러나 이 전환은 제어실 장비의 어떤 (또는 신중하게 계획된) 중단없이 위험없이 발생해야 합니다.

관련 고객 사례

dairyland energy utilities customer story usa
2024 · Wisconsin, United States

Dairyland Power Cooperative elevates situational awareness

This case study delves into the transformation of Dairyland Power Cooperative, highlighting their commitment to enhancing customer service through a comprehensive upgrade of their System Operation Center. At the core of this redesigned space lies a state-of-the-art video wall system that not only elevates situational awareness but also adheres to the critical infrastructure protection (CIP) space requirements outlined by NERC for a medium-impact control room.
2016 · Noida, IN

India’s largest Integrated Power Company makes the best and brightest choice with Barco video wall

1915 marked the founding of Tata Power in the form of India’s first large hydroelectric project in Maharashtra. Since then, the company has established itself as a leading integrated power company - with an installed generation capacity of 10477 MW as on Sep 2016 - and a renewable energy frontrunner in India. Upon moving to a new facility in 2015, Tata Power decided that it was time for a new, high-quality display solution in its Fleet Monitoring Center, to be able to meet today’s challenges head-on.
2015 · Tucker, Georgia, US

Modernizing grid operations at Georgia System Operations Corporation

One of the largest electric cooperatives in North America, Georgia System Operations Corporation (GSOC) recently upgraded its transmission control center to modernize operations and provide greater situational awareness to its operators. The centerpiece is an expansive video wall solution developed by Critical Space Solutions and Barco, displaying crystal-clear data and graphics while empowering efficient visual collaboration.
2014 · Allentown, Pennsylvania, US

Modernizing transmission operations at PPL Electric Utilities

When PPL moved its transmission control center to a brand new building, a new visualization platform was at the top of the list. “I knew that we’d experience not only improved image quality, but much lower operating costs with an LED wall,” comments Jeffrey Daniels, Senior Engineer–Transmission & Distribution for PPL. “It saves us both time and money since we’ve eliminated consumables and greatly reduced maintenance time. Plus, it’s much more reliable. The image quality is also excellent thanks to increased brightness.”