巴可搜索

myBarco 通知

未读

读取

您没有任何通知。

专为全天候能源分配监控而设计

公共事业提供商肩负重大责任,向大众和工业领域提供电、油气和水等重要服务。能源和公用事业部门越来越关注数字化转型,这场运动有望在改善与客户的互动、简化运营、流程自动化和提高效率方面取得巨大成功。但是,这种转型需要无风险地进行,没有任何控制室设备中断,或者精心规划了这种中断。

相关客户案例

dairyland energy utilities customer story usa
2024 · Wisconsin, United States

Dairyland Power Cooperative elevates situational awareness

This case study delves into the transformation of Dairyland Power Cooperative, highlighting their commitment to enhancing customer service through a comprehensive upgrade of their System Operation Center. At the core of this redesigned space lies a state-of-the-art video wall system that not only elevates situational awareness but also adheres to the critical infrastructure protection (CIP) space requirements outlined by NERC for a medium-impact control room.
2016 · Noida, IN

India’s largest Integrated Power Company makes the best and brightest choice with Barco video wall

1915 marked the founding of Tata Power in the form of India’s first large hydroelectric project in Maharashtra. Since then, the company has established itself as a leading integrated power company - with an installed generation capacity of 10477 MW as on Sep 2016 - and a renewable energy frontrunner in India. Upon moving to a new facility in 2015, Tata Power decided that it was time for a new, high-quality display solution in its Fleet Monitoring Center, to be able to meet today’s challenges head-on.
2015 · Tucker, Georgia, US

Modernizing grid operations at Georgia System Operations Corporation

One of the largest electric cooperatives in North America, Georgia System Operations Corporation (GSOC) recently upgraded its transmission control center to modernize operations and provide greater situational awareness to its operators. The centerpiece is an expansive video wall solution developed by Critical Space Solutions and Barco, displaying crystal-clear data and graphics while empowering efficient visual collaboration.
2014 · Allentown, Pennsylvania, US

Modernizing transmission operations at PPL Electric Utilities

When PPL moved its transmission control center to a brand new building, a new visualization platform was at the top of the list. “I knew that we’d experience not only improved image quality, but much lower operating costs with an LED wall,” comments Jeffrey Daniels, Senior Engineer–Transmission & Distribution for PPL. “It saves us both time and money since we’ve eliminated consumables and greatly reduced maintenance time. Plus, it’s much more reliable. The image quality is also excellent thanks to increased brightness.”